Am i eligible to get electrical supervisor licence? As i did
diploma as well as degree in Electrical Engg. in June 2011.
Now i am working in 15 MW Power plant from 2 mnths. i belongs
to Maharashtra.
Answer / subbiah
i think not possible............because u should have a experience in Transformer commissioning for one year.and knowledge of wiring installations.
| Is This Answer Correct ? | 2 Yes | 3 No |
what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.
why induction motor's p.f 0.8
How would u describe the function of a generator & motor?
Work done in a free expansion process is
if we give 60 hz single phase supply to the transformer used in europe , than what will happen
which circuit takes max. load & which circuit takes min. load i.e. SERIES CIRCUIT OR PARALLEL CIRCUIT??
what size of copper busbar use for 11kv 630A
we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.
why you don not show protection and type of isolation in key single line diagram?
I am working as maintenance engg. in electrical but i want to do carrier in electrical drawing.Tell me about that.
what does a k rating in a transformer means?
How can we calculate C10 rating of a bttery from c5 or c20 ratings??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)