Am i eligible to get electrical supervisor licence? As i did
diploma as well as degree in Electrical Engg. in June 2011.
Now i am working in 15 MW Power plant from 2 mnths. i belongs
to Maharashtra.
Answer / subbiah
i think not possible............because u should have a experience in Transformer commissioning for one year.and knowledge of wiring installations.
Is This Answer Correct ? | 2 Yes | 3 No |
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
please send me privious exam's queation papers of section engineer(electrical).
can motors working at parallel operation like D.G set and transformers? It means asking about two motors coupled with same load???
why we use 6nos of C.Ts on 11kv incoming?
Why MS rod or flat are used in stead of GI rod or flat in switchyard earth mat ?
What is the gain of 1-s/1=s at 1 rad/sec?
explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)
6 Answers TNEB Tamil Nadu Electricity Board, wbsedcl,
if the power factor is .88 i want to increase the power factor to .99 what number of capacitor is to add?
CAN ANYBODY EXPLAIN WHAT ACTUALLY MEAN BY THE PHASE DEFFRENCE? R,L,C CIRCUITS?
What is SMPS,How does it works?
Is better to supply the voltage for static exciter from the auxiliary power source or from the SG terminals? And why?
How can calculate HT side VCB? For example I have 1250 KVA load what will be HT side VCB Amp.range and what size XLPE cable I use for HT side.
2 Answers NASSA, Orchid, SB Automation,