Am i eligible to get electrical supervisor licence? As i did
diploma as well as degree in Electrical Engg. in June 2011.
Now i am working in 15 MW Power plant from 2 mnths. i belongs
to Maharashtra.
Answer Posted / subbiah
i think not possible............because u should have a experience in Transformer commissioning for one year.and knowledge of wiring installations.
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?
specific difference of ICT&Auto Transformer
what is lumped and distributed elements?
Can anyone explain me about the RLC based Impulse high voltage generator and how to and operation of Series resonant High voltage reactor...?
why does connected a indutor with mnsformeretering core of current transformer ?
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
what is meant by skew width in machines?
how can i reduce sparking without stepdowning the voltage
hr round
What are the components of feedback control system?
What is rotating magnetic field?Discuss elaborately.
how calculate the electrical load for industry and office
What is a feedback in control system?
Dear Mr B C pal...Can you plz. put some light on principle of operation of Z-Ct in conjunction to its use with 1Cx1000Sqmm HT Cables & Directional Ground Fault / Over Voltage Relays...Regd..Parag v K 9899115632
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.