Am i eligible to get electrical supervisor licence? As i did
diploma as well as degree in Electrical Engg. in June 2011.
Now i am working in 15 MW Power plant from 2 mnths. i belongs
to Maharashtra.
Answer Posted / subbiah
i think not possible............because u should have a experience in Transformer commissioning for one year.and knowledge of wiring installations.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is high and low cut off voltage of BB and DG at SPS????????
placement paper samples of mspl company
Alternator rotor earth fault relay circuit
How do apply electrical 'c'license......pls advice
Is RTCC panel needs any control supply.
What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?
can i use 2000/5A Clamp meter to measure HT cable
how to increase senstivity of ct
What is limitedly stable system?
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
why chock were used in old tubelights but are not newest tubelights?
What is the basis for framing the rules of block diagram reduction technique?
How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter
how do i work out the Amps of a incommer if i am running 1 37 KW motor and a 0,75 KW motor and some solinoids
What are the two types of compensation?