1.how to calculate 4*3 runner qty in cft.
2.how to calculate the nails qty.(column,beam,slab)
3.if any formula for binding wire qty calculation.
Answer / ratheesh
1. First you have to convert inches to feet, 1 inch =
.083feet, Then u have to multiple length, breadth & width.
2. approximate .750grms to 1kg for 1 sqm shuttering.
| Is This Answer Correct ? | 4 Yes | 3 No |
What is the maximum distance between the stirrups?
define quantity of each ingredient in 1:3:6 mix concrete by volume?
0 Answers NJS, Pratibha Industries,
what is minimum dimension for the kitchen & bed room
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
for mortar 1:18 how much cement and sand required for 1 CM
what is Bearing Capacity,How to determine it?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
7. Do you apply the skills and knowledge learnt at school in your work?
how do measure the safe bearing capacity of soil? what is the compresive strength for concret?(max.&min.)
explain kn/sqm in detail.
Where are laterally loaded piles are used in practice?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)