1.how to calculate 4*3 runner qty in cft.
2.how to calculate the nails qty.(column,beam,slab)
3.if any formula for binding wire qty calculation.
Answer Posted / ratheesh
1. First you have to convert inches to feet, 1 inch =
.083feet, Then u have to multiple length, breadth & width.
2. approximate .750grms to 1kg for 1 sqm shuttering.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
How to make a c++ program that converts any base to base 10?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is GSB gradation
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
brickwork labour rate per cum ?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
What are the uses of layer?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is Density of cement, sand & aggregate ?
Critical Path Method is...
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
whats is difference between anchorage length and development length
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Define absolute co-ordinates?