what are the steps to commissioning a DCS system?
Answers were Sorted based on User's Feedback
Answer / dhanraj suman
1. Panel alignment.
2. Power up DCS with electrical wiring checking.
3. Checking of proper grounding/earthing.
4. Preliminary Electrical I/O testing.
5. Instrumentation Loop checking.
Is This Answer Correct ? | 36 Yes | 1 No |
Answer / aswini ku sahoo
1-proper allignment of pannel
2 power cable laying from UPS DCDB
3-Checking of proper grounding or earthing
4 Negtive terminal of sup. Vol shuold be zero potential.
and then connect the power cable with proper polarity.
5 U r now almost ready to switch on the pannel but now
one imp thing is to disconnect all AI/AO CARD connector
6 All connector pin should not be sort with the ground.
7 Now swith on the pannel
8 Next UTP cable laying work from DPU TO HMI.
9.Agfter proper connection of UTP ping the system
with priper IP addresss.
10 .now start loop cheching and one by one signal throwing
10.Aftr then one by one
Is This Answer Correct ? | 2 Yes | 0 No |
I have got a call of IOCL interview for projects having 2yrs experience. What sort of questions should I expect in the interview?
the square root type transmitter r used to which applications
PLZ explain to me massflow
What is the basic difference between Modbus and CAN Open Protocols
A valve in series with an orifice plate (DP transmitter), is aligned for constant pressure in the pipeline, if there is an error dx, How to align it in process.
Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent
What is SLPC & MLPC? How it works?
Wht should be the ratio of natural frequency (Fn) to wake frequency (Fw) and wht if goes above the rato limit?
What is Electrical Runout & Mechanical Runout in Vibration measurement.
Coal mill Instruments Equipments for cement plant And process diagram ?
GIVE BRIEF DESCRIPTION ABOUT "DCS"
how to define range of dp level xmeter in open tank