what are the steps to commissioning a DCS system?
Answer Posted / aswini ku sahoo
1-proper allignment of pannel
2 power cable laying from UPS DCDB
3-Checking of proper grounding or earthing
4 Negtive terminal of sup. Vol shuold be zero potential.
and then connect the power cable with proper polarity.
5 U r now almost ready to switch on the pannel but now
one imp thing is to disconnect all AI/AO CARD connector
6 All connector pin should not be sort with the ground.
7 Now swith on the pannel
8 Next UTP cable laying work from DPU TO HMI.
9.Agfter proper connection of UTP ping the system
with priper IP addresss.
10 .now start loop cheching and one by one signal throwing
10.Aftr then one by one
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to calibrate radar type level transmitter for interface level? Total liquid(liq.1 and liq.2), level both the liq individually? For. Both the liquid levels how the signal will go from transmitter to dcs? How to calibrate. Single radar 9:26:55 AM for 2 different liquids in a tank?
what is interlock system and why we use of this?
whatis range of marcury filled tempereture gague
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
What should be the main consideration while starting the Rotating compressor when we dont know the cut in and the cut off pressure setting of the pressure switch
Why use ball valves on Gas pipelines instead of gate & or globe valves...means basic diffrence or use of these valves..how designers knows this type of valve with rating is required...
Which Signal hart communicator work? If there any signal change when hart connect while transmitter in line ?
what is compensation? temprature & pressure
Explain the burnout feature.
How the sizing of the analog signal cable is calculate?
1. what is modbus cable? 2. what kind of communication we are using for the interface of DCS, ESD and Third party cabinets? 3. What is serial communication and peer to peer communication?
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
HI friends.I am Surya a BTech in Electronics and Instrumentation Engineering.I am going to appear Relince Industries Ltd all India writen test very soon. so plz help me by sendind the probable questions about my subject.My mail ID is surya.barik@gmail.com.
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??