what are the steps to commissioning a DCS system?
Answer Posted / aswini ku sahoo
1-proper allignment of pannel
2 power cable laying from UPS DCDB
3-Checking of proper grounding or earthing
4 Negtive terminal of sup. Vol shuold be zero potential.
and then connect the power cable with proper polarity.
5 U r now almost ready to switch on the pannel but now
one imp thing is to disconnect all AI/AO CARD connector
6 All connector pin should not be sort with the ground.
7 Now swith on the pannel
8 Next UTP cable laying work from DPU TO HMI.
9.Agfter proper connection of UTP ping the system
with priper IP addresss.
10 .now start loop cheching and one by one signal throwing
10.Aftr then one by one
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....
how to calibrate 0- 150 psi presure gauge by dead weght tester
Please tell me details about Sox,Nox,SWAS analyser????
What is the diffrence between ff tx and non ff tx
the whole paper was based on Transducers..questions like define repeatability, error,accuracy,precision..den there were many q. on the conversion of Pa to mmHg and other units.. also..der wer few Q. on some level sensors(with diagram)
How to calibrate RC Feeder system in thermal power station?,If any instrument available to calibrate it,ple inform me. make:stock,
while am calibrating Drager polytron 2IR flame gas detector occured non zero status.how can i get zero status?
Explain the mechanism behind the turbine meter.
Q- Control problem are mainly classified in _____ types. a-)4 b-)3 c-)6 d-)nono of these Few of them i know is 1- regulator type problem (eg- Air conditioner) 2- tracking problem (eg missile trcking problem) 3- sybernatics 4- optimal control problem
There are many type of control cable like pair,core,tried, What are defination each one
We are using Rosemount 5400 series Radar Level Transmitters in all types of Sump Applications having oily water hdrocarbon petrochemical nature. What we are facing the problem frequently is that always getting reading frezzed at some value. If we do power recycling , sometimes it is working . then making same freezing problem. If anybody faced before such type of problem and also having solution , Please give the answer.
what is the minimum power (P=VI)to produce a spark?
Question on maha cement
why we us isolation barrier in hazardous area how it works to protect the area and please clarify its current flow.
what is zero and span ?