how to calculate the runner (2*3) qty in cft. the length is 8 feet.
Answer Posted / nepolian.m
=(2"*3"*8")/1728= 0.028 cft
| Is This Answer Correct ? | 9 Yes | 11 No |
Post New Answer View All Answers
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
List out some of the checking’s, done at the completion of construction?
how much tempareture are required to make liquid state of pid leed
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Define current ucs?
Explain moment of inertia?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What is the per cu. mt. price of ready mix in Gujarat region.?
can you give me the details of rate analysis of steel and concrete?
Define What is Civil Engineering?
Why are steel plates inserted inside bearings in elastomeric bearings?
Civil engineering related
What is the biggest dam in america?