how to calculate the runner (2*3) qty in cft. the length is 8 feet.
Answer Posted / naval sharma
2*3*8/144
0.3333 cft
| Is This Answer Correct ? | 169 Yes | 27 No |
Post New Answer View All Answers
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what r the precaution for high in atp tempareture,low in atp tempareture
what is education Cess.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
Explain what is zoning permit?
what is the water cement ratio for plastering
What are the advantages of building a dam on the river nile?
What is aggregate?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What are the advantages and disadvantages of lead products in construction?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
what could be the production cost of 1 cum of concrete by CP30 plant
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is modular brick and it size
what is grade intersection?