Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the runner (2*3) qty in cft. the length is 8 feet.

Answer Posted / naval sharma

2*3*8/144
0.3333 cft

Is This Answer Correct ?    169 Yes 27 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1810


what r the precaution for high in atp tempareture,low in atp tempareture

2043


what is education Cess.

2200


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

1107


Explain what is zoning permit?

1321


what is the water cement ratio for plastering

1642


What are the advantages of building a dam on the river nile?

1126


What is aggregate?

1131


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1977


What are the advantages and disadvantages of lead products in construction?

1198


How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

2037


what could be the production cost of 1 cum of concrete by CP30 plant

1708


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2859


what is modular brick and it size

1741


what is grade intersection?

2071