Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why electricity in India is in the multiples of 11 like
11kv, 22kv, 33kv

Answers were Sorted based on User's Feedback



Why electricity in India is in the multiples of 11 like 11kv, 22kv, 33kv..

Answer / rajeevkumar

just read abt form factor....

Is This Answer Correct ?    11 Yes 3 No

Why electricity in India is in the multiples of 11 like 11kv, 22kv, 33kv..

Answer / shashidhar

Transformer Induced voltage equation contains 4.44 factor.

E=4.44*f*T*phi
E -Induced emf per phase
T -number of turns
f -frequency
phi -maximum flux per pole

From the equation we see that E is proportional to 4.4 and
it is in turn multiple of 11.
So always transmission voltage is multiple of 11

Is This Answer Correct ?    12 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

What is Surge Capacitor? Why it is use in Generator Circuit Breaker?

0 Answers   TCS,


why nearly all voltages are in the multiples of 11?

5 Answers  


write a c++ code that receives an integer number and display the sum of the number and its revers integer?

0 Answers   MIT,


why the generator will take 8 to 12 hours to start after it got interrupted due to technical problems in case of power plants.

1 Answers   NTPC,


What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?

0 Answers  


I have 2 transformers in two different plants, both are without OLTC but i am facing problem of voltage fluctuation at LV side from only one transformer. i have to change its taps manually twice in a day. Another transformer delivering voltage is ok. Please guide me about the problem

1 Answers  


what is Aircraft earthing and what does it do?

6 Answers  


HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?

0 Answers   TMB,


what u meant of power plant?

5 Answers  


what is the difference between Resistance VS capacitance

2 Answers   Jindal,


What is the difference when selecting a cable between AC and DC current?

13 Answers   ABB,


Why HT voltages are expressed in 11KV,22KV,33KV and so on? (ie in times of 11)

3 Answers   Bhel, Park Hotel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)