what is the difference b/w full length and cutting length?
No Answer is Posted For this Question
Be the First to Post Answer
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is the functional difference between DOME and R.C.C., where purpose of both covering roof?
How to do base isolation for RC framed structure using ETABS software?
Formula for Calculating the Quantity of eccentric footing
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
What is the proportion of cement agg. and sand for M20,M25 and M30?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
afe or not
what"s the formula for circumference?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)