Dear sir,
What is the procedure for total station?How to
calculate?
Answer Posted / kumars
TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.
FROM KUMAR
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
howto calculate the quantities of material used in fly ash brick after finding the volume??
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
IS code for grade of concrete for bamboo lintel????
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
can you give me the details of rate analysis of steel and concrete?
What are the applications of cad?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What are the advantages and disadvantages of lead products in construction?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
what"s the sort of beams?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Doul Bar reinforcement and details of drawing.
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????