Dear sir,
What is the procedure for total station?How to
calculate?
Answer Posted / kumars
TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.
FROM KUMAR
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
which type of instrument included in plumbing work?name of instrument?
How is improve my knowledge in construction industries....
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Explain the advantages and disadvantages of using plastic and timber fenders?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
All aptitude question of Bechtel
Under what circumstances should pot bearings be used instead of elastomeric bearings?
Why you are leaving present job?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What are the Types Of DPC and its Thickness used?
Define Workability ?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
For what purpose bedding is used under storm water drains?