How to control user only can schedule immediate background
job but cannot schedule period background job?
Answers were Sorted based on User's Feedback
Answer / r
A thyristor is a solid-state semiconductor device with four layers of alternating N and P-type material. It acts exclusively as a bistable switch, conducting when the gate receives a current trigger, and continuing to conduct while the voltage across the device is not reversed (forward-biased).
Is This Answer Correct ? | 0 Yes | 3 No |
Answer / hit$
To Schedule the Periodic Background job which is failed, we
use firefighter IDs....
Is This Answer Correct ? | 1 Yes | 14 No |
How many Tcodes can be assigned to a role ?
Q2) Can we ADD an organisational element in a role? If yes how??
What is difference between BW and BI Security?
how to transport roles?
how do we get list of users who are having mail-id’s in SU01 (Address tab)
1.What is the difference between Su24,su22,and su21? 2.What are the advantages of GRC in segregation of duties when we compare with virsa? 3.There is one derived role, if i copy the role of derived role will the parent or master role will be the same for the new which is derived from the derived role, if so why if not why? 4. what are the organizational level?
Difference between 4.7c and ECC 6.0 in security aspect? I tried in many website but still not able to find the correct one.
Q1) What is the difference between Derived Role & Copy Role? Can't we just do a copy instead of deriving it when both have the same characterstics or inputs or functions??
use of T-code SE63
why fire fighter id is using in the production system ?
What are se09 t-codes used for?
what is the difference in grc background jobs