What are the tests to be conducted on cement?
Answer Posted / prashant pawar
Laboratory Test :-
1. Consistency Test
2. Fineness Test
3. Soundness Test
4. Compresive Test
5. Initial and Final setting Time Test
On Site Test:-
1. Date of packing
2. Colour
3. Rubbing
4. Hand Insertion
5. Float Test
6. Smell Test
7. Presence of lumps
8. Shape Test
9. Strength Test
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
can i get hindi version of is codes based on civil engineering?
what is the composition of good brick ?
How many cum of 9.5mm stone in 1 ton ?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
what does the track parameter mean in staad.pro?
What is the usage of zoom command?
How do you calculate the power of centrifugal pump?
significance of specific surface area of particles?
what pressure the NP2 class RCC pipe can sustain?
For what purpose bedding is used under storm water drains, explain?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to build the floor to ceiling bookcase?
What is zoning permit?