Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?



I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shutterin..

Answer / javed

1) Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge)

M3


Mate

Labour


0.06

0.62


_

_
2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge)

M3


Mate

Labour


0.05

0.50


_

_
3) Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m

M3


Mate

Labour

Bhisti


0.02

0.25

0.02


_

_

_
4) Concrete :

Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate)


M3


Labour

Bhisti

Mixer operator

Mixer


0.50

0.10

0.07

0.07


_

_

_

_
5) Mixer mixed cement concrete

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.10

1.63

0.70

0.07

0.07

0.07


_

_

_

_

_

_
6) Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.17

2.00

0.90

0.07

0.07

0.07
The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
7) Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement.

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.24

2.50

0.90

0.07

0.07

0.07


_

_

_

_

_

_
8) Mortars :

Mixing by hand, cement mortar of any mix/proportions


M3


Labour

Bhisti


0.75

0.07
Labour required will be approximately same for different mix proportions.
9) Brick work (straight walls) :

Brick work in walls exceeding one brick thick, in cement / lime mortar




M3


mason

Labour

bhisti


0.94

1.80

0.20
The constants include labour involved in scaffolding.
10) Brick work in walls, one brick thick, in cement/lime mortar

M2


mason

Labour

bhisti


0.25

0.40

0.10
The constants could be adopted for brick work with any mix or mortar.
11) Formwork :

a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork :

1) rectangular column and walls

2) suspended floors/roofs

3) sides and soffits of beam


M3

M2

M2


Carpenter

Labour

Carpenter

Labour

Carpenter

Labour


0.25

0.20

0.23

0.20

0.30

0.20


_

_

_

_

_

_
12) Reinforcement:

Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete


Quintal


Bar bender

Labour


1.00

1.00


_

_
13) Plastering and pointing :

a) 15mm thick cement plaster to ceiling including mixing of mortar.

b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar

c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.


M2

M2

M2


mason

Labour

bhisti

mason

Labour

bhisti

mason

Labour

bhisti


0.08

0.10

0.10

0.06

0.10

0.10

0.10

0.15

0.10


_

_

_

_

_

_

_

_

_
14) Damping proof course :

a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.


M3


Mason

Labour

bhisti


0.10

0.10

0.01

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

clean earthing and dirty earthing

1 Answers   CSCEC-China State Construction Engineering Corporation,


the coefficient of curvature for a well graded soil must be inthe guage 0.5-1 3-4 4-5 none

1 Answers  


What is the maximum distance between the stirrups?

11 Answers  


WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?

2 Answers   L&T,


HOw much % of premium on DSR-2013 currently

0 Answers   NICE,


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

0 Answers   AIZAZ General Contracting General Maintenance, GK Realtors,


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

0 Answers   L&T,


What is meant by solid geometry?

0 Answers  


how to calculate ractangular water tank capicity

3 Answers   Gokhale Constructions,


Okay guys I m new here i wanna ask you that ,if i mix two three larger stones (about 20cm dia)in concrete for column or footings what actually happens, how the strength of concrete is reduced? and why it is not allowed?

3 Answers  


polavaram project is situated inwhich place?

8 Answers  


how the centre of gravity is used in construction?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)