I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?
Answer / javed
1) Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge)
M3
Mate
Labour
0.06
0.62
_
_
2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge)
M3
Mate
Labour
0.05
0.50
_
_
3) Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m
M3
Mate
Labour
Bhisti
0.02
0.25
0.02
_
_
_
4) Concrete :
Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate)
M3
Labour
Bhisti
Mixer operator
Mixer
0.50
0.10
0.07
0.07
_
_
_
_
5) Mixer mixed cement concrete
M3
mason
Labour
bhisti
mixer operator
mixer
vibrator
0.10
1.63
0.70
0.07
0.07
0.07
_
_
_
_
_
_
6) Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement
M3
mason
Labour
bhisti
mixer operator
mixer
vibrator
0.17
2.00
0.90
0.07
0.07
0.07
The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
7) Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement.
M3
mason
Labour
bhisti
mixer operator
mixer
vibrator
0.24
2.50
0.90
0.07
0.07
0.07
_
_
_
_
_
_
8) Mortars :
Mixing by hand, cement mortar of any mix/proportions
M3
Labour
Bhisti
0.75
0.07
Labour required will be approximately same for different mix proportions.
9) Brick work (straight walls) :
Brick work in walls exceeding one brick thick, in cement / lime mortar
M3
mason
Labour
bhisti
0.94
1.80
0.20
The constants include labour involved in scaffolding.
10) Brick work in walls, one brick thick, in cement/lime mortar
M2
mason
Labour
bhisti
0.25
0.40
0.10
The constants could be adopted for brick work with any mix or mortar.
11) Formwork :
a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork :
1) rectangular column and walls
2) suspended floors/roofs
3) sides and soffits of beam
M3
M2
M2
Carpenter
Labour
Carpenter
Labour
Carpenter
Labour
0.25
0.20
0.23
0.20
0.30
0.20
_
_
_
_
_
_
12) Reinforcement:
Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete
Quintal
Bar bender
Labour
1.00
1.00
_
_
13) Plastering and pointing :
a) 15mm thick cement plaster to ceiling including mixing of mortar.
b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar
c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.
M2
M2
M2
mason
Labour
bhisti
mason
Labour
bhisti
mason
Labour
bhisti
0.08
0.10
0.10
0.06
0.10
0.10
0.10
0.15
0.10
_
_
_
_
_
_
_
_
_
14) Damping proof course :
a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.
M3
Mason
Labour
bhisti
0.10
0.10
0.01
| Is This Answer Correct ? | 0 Yes | 0 No |
hi i am working in a civil Lab .....they asked me to find out the compressive strength of concrete cubes after 7 days of curing....the value of load on CCT machine is 205KN how to convert it to Kg/cm2 ....plzz help me...........
which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.
Define What is unit weight of normal concrete?
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
What in your past experience or education prepares you for the position for which you are applying
What is GSB gradation
yasser arfatcompleted his degree in civil from which university
How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
how the centre of gravity is used in construction?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)