What is meant by solid geometry?
No Answer is Posted For this Question
Be the First to Post Answer
What is the thumb rule for calculating the number of chairs in slab?
what happens when the curing is not done properly for structures ??
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Quality control
I heard Thump rule about beam depth is 1" per 1' length. Is this correct? If not please tell me the thump rule.Thanks.
what is the mix design for M:60 with micro silica andmetakaoline?
What is the difference between auto & dumpy level
m15 screeding concrete ration calculation
how to calculate rate analysis for shuttering of waffle slab
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)