clean earthing and dirty earthing
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What are the defects in concrete?
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?
15 Answers Boss Global, JP Group, Kerakoll, NextGen, Simplex,
what is the diffrence between grade beam and plinth beam
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
what is the weight of sand,corrse aggregate and steel,for 1cum
1 Answers Gulf Asia, Jade Software, Sand,
HOW CAN DESIGN LENGTH,WIDTH AND HEIGHT THE FOUNDATION FOR THREE FLOOR BUILDING?
Doul Bar reinforcement and details of drawing.
0 Answers Atlanta Infrastructure,