Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.
Answer Posted / s.prabhu
Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)
Volume of top / slope portion is called as Volume (v2)
V1 = L1xB1xh1
V2= h2/3* (a1+a2)* square root of (a1+a2)
L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2
For any clarification
Please call
S.Prabhu
9901702081
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
How do we test on design and style in a software?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
what is the 0 value in quantity surveying
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
define the strength
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
For the construction project what capital cost has to be taken in consideration?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft