Answer Posted / sandeep kumar
1st Rl-last RL=rise-fall
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
any book or article on pumped concrete.
Which prize is the alternative to the NOVEL Prize?
can any one explain bar bending schedule of bems and columns and slabs ??
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Explain what is the difference between built area and super built up area?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
what is the method used for marking of cantilevers in hirise buildings by using theodolite
How will be cutting in timber plate size 600*400 column size
What is bmc stands for in bmc software?
Mention what are the composition of a landfill?
How much quantity water should be placed in one cubic meter area?
How many lbs are there in a yard?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
pls tell me about method of cutting length of ties column
Define What is the force exerted by the Tacoma narrows bridge?