what is work of planning deptt. in any construction compny (in
road project)
No Answer is Posted For this Question
Be the First to Post Answer
Why we test compressive strength after 28 days..?
3 Answers NM Caramoan Builders,
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
what is the difference between site engineer & site incharge
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
How to check the quality of fine aggregate on site?
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
Sand density
what is the ratio of cement water and sand in RCC?
Rate analysis of painting
how to find steel quantity
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)