Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow?
sand=Rs.500/mt
Brick=Rs.5/brick
Labour=Rs 300/day
Free issue=cement+water+electicity.

Answer Posted / dipak d patel

1 Bricks no. 5000.00 005.00 25,000.00
2 Sand cum 2.64 706.00 1,865.72
3 Cement Bag 15.60 000.00 3,120.00
4 Labour Day 16.00 500.00 8,000.00
5 Mason Day 07.00 500.00 3,500.00
6 cont profit, OH to be considered as per your
regualations. Normally 15% to be considered for the same.

Total Rate for 10 cum without contractor's profit is
41,485.72 Rs/10cum.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Calculation of curtain wall of box culvert

6112


why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?

3045


What is the largest concrete dam in the world?

1200


Define block?

1182


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

11189


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1971


what is mc arther pile?

2264


How to calculate woden area in sft and Cft

1594


04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1

2046


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2545


How can you produce desired alloys and discuss their applications in daily life.

1237


What is the method of soil replacement test?

2151


What is Refuse Area In High Rise Building ?

2192


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3789


How do you maintain water pressure?

1204