Answer Posted / ram
To resist SHEAR FORCE, To Hold the MAIN BAR in proper
position, toresist the buristing of Column & Beam
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
how many time use of plywood shuttering and IS code
Give me an example of a time when something you tried to accomplish and failed.
what is escalation?how it is done?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
What is kn measurement?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
How to increase a bearing capacity of soil?
What is the average density of soil?
Formula for calculating the volume of bulb in underreamed pile
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?