Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


where we provide hinged joint in a framee structure ?

Answers were Sorted based on User's Feedback



where we provide hinged joint in a framee structure ?..

Answer / c. mak

In portal frames, hinged joints can be assumed at various
points depending on the fixity of its supports.

Is This Answer Correct ?    4 Yes 1 No

where we provide hinged joint in a framee structure ?..

Answer / ankitkumar

If Free moment is to be allowed and fixity is not in
concern then hinged joint is provided.

Is This Answer Correct ?    3 Yes 1 No

where we provide hinged joint in a framee structure ?..

Answer / a.a. singhai

In intermediate beams, when development length is not
provided in column, it behaves in between hinged and fixed.
In this case, it is been designed as hinged and referred
as hinged joint.

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

1. How do you handle non-productive team members?

4 Answers  


state the functional requirement of a retaining wall

5 Answers  


what is the difference between compaction and consolidation??

7 Answers  


What is the difference between shear and tensile strength?

0 Answers  


What is the bending moment ?

1 Answers   L&T, Manav Infra Projects,


What do we mean by partial moment release ??

0 Answers  


Formula for calculating the volume of bulb in underreamed pile

0 Answers  


what is the ingrediants of wet mix macadam?construction procedure?

6 Answers  


why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

7 Answers  


For what building Built-on balconies are preferable? What are the advantages?

0 Answers  


what is called super elevation of the road?

1 Answers   PBL,


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)