The neutral&earth voltage is 0v.But we were connected the lighting load at the time ballast was failed.why?
Answer / k.prakashchandra
The earth is not used as a supply terminal.It can be used
for earthing metallic parts.It appears that you used the
earth wire in place of neutral.What kind of failure was
there in the ballast ?
| Is This Answer Correct ? | 1 Yes | 0 No |
11kv has three live wires how much voltage is in its single wire(leaving the other two wires)
A electrical meter has load 500 kw. In 2 hr what rading will come on meter.
what is difference between sub-station and switch yard.
What is full form of G.O.D in 11kv distribution?
10 Answers GOD, MSEB, Shyam Indus Power, STL,
what are the main parts of DG? explian thier functions?
8 Answers Apollo Power, Tata DoCoMo, Tyco, Vizag Steel,
Load break swicth maintenance procedure.
shall we use a machine having 60Hz frequency in india ? why?
what are the types of starter ?
25 Answers Andhra Sugars, Bhel, Eveready, HyFun Foods, Jindal, ME, Valeo Lighting Systems India Private Limited,
what is the difference between grounding and earthing......how can we differentiate each other.....
what is the difference between fc-tcr and tsc in facts
3 Answers SCET Shadan College Of Engineering and Technology,
a simple c++ program to calculate simple interst with its data members as private
Why we use Fuse in transformer in secondary side.Why we dont use fuse in primary side?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)