what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
No Answer is Posted For this Question
Be the First to Post Answer
density of flyash
How to calculate the lap length rod of column, Beam,Slab please give me a details?
4 Answers Ali Baba Engineering and Construction Company, Asha Realty Developers,
What"s mean by water macadam road (WBM)?
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
what is the coefficient for running feet to cft coversion both area and price
what is lap length? why it is required?
Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??
Give list of building construction equipment & explain about them in brief. How much is fuel consumption of JCB, DUMPER, POCLAIN, TRANSIT MIXER?
How to find CN by using arcgis 9.3?
what are the differences between opc cement and ppc cement in applications?
where we use one way slab and two way slab?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)