draw a circuit diagram connecting transformer OLTC- RTCC-
VCB-Marshalling Box otherwise Explain in words



draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in ..

Answer / alleysyed

OLTC stands for On Load Tap Changer, which means that a user
can change the taps of transformer winding without
disconnecting the transfomrer from the supply. Taps are
changed in order to regulate the voltage. OLTC has number of
taps . They may be 10, 11, 16 , 20 or the customer specified
rating.
Marshalling box is a box in which manufacturer of
transformer bring alarm and trip contacts signalling from
the accessories associated with the transformer. For
example, Oil temperature indicator installed on the T/F
provide a signal of alarm when the temperature of oil
exceeds the specified limit of Indicator. If temperature
exceeds more, it send the trip signal to Marshalling box,
which disconnects the transformer from main supply and
vacuum Circuit Breaker is tripped. VCB is installed on the
High Voltage side of the TF in the HV Protection panel.

Is This Answer Correct ?    31 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

Why 36 KV LA is used in 33 KV Line and 9 KV LA is Used in 11 KV Line

1 Answers   APTransco, Bhel, Wipro,


how to find value of resistance when 1 kw consumption for 10 minutes

1 Answers   Manipal Hospital,


what is isolation Transformer?

8 Answers   HP,


errection check list for transformer maintenance

0 Answers   RRB,


What is the count of hvdc transmission lines in india?

0 Answers  






why transformer comes only in standard rating like 11kv,33kv,66kv....and not like 33.33kv and so on?

3 Answers  


what is the calculation formula for motor starting torque,running torque, running torque.

0 Answers  


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

0 Answers  


AC 230V BULB GIVING DC SUPPLY WHAT HAPPENS?

2 Answers  


1.what is the basic difference between surge arrestor and lightning arrestor and where we use it. 1.what is the difference between metal oxide without gapped lightning arrestor and with gapped lightning arrestor

2 Answers  


How will be the single line diagram of series trip HT breaker? how it works?

0 Answers   HAL,


what is the AC Plant and how can do the work with parts and picture tell us 150 Tr

0 Answers   Wipro,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)