how 1.52 factor comes while calculating no of bags of
cement...from 1:2:4 design mix?
Answer Posted / ajay kumar singh
For 100cum of finished concrete =152cum dry volume of
conc. Hence for 1cum the factor will be 1.52
Calculation of material in 1cum of (1:2:4)conc.
Cement=1.52/1+2+4=0.217cum
Sand=0.217*2=0.434cum
Metal=0.217*4=0.868cum
Is This Answer Correct ? | 63 Yes | 6 No |
Post New Answer View All Answers
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Technical Question of Civil Engineering
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
How can you achieve soil enforcement?
give me the rate analysis for Bituminous Macadam and SDBC
What is meant by cad?
Define What is a projection line?
Define What are the reasons for geotechnical site investigations in Uganda?
Explain major difference between auto level and dumpy level?
How to make tiles floor step by step procedure?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
VAT and CST ? Which benefits for buyer ? Why benefits?
to minimize budget cost of building , what can i do
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what is Brick crushing strength(PSI)?