Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE
DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND LAYING THE
CABLES

Answers were Sorted based on User's Feedback



IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND..

Answer / anil

In overhead cables, we donot require any cooling media as
air is cooling media. whereas in Under ground cables, in
pucca trench, we put sand around the cable before is it is
cemented.The reason for sand is that it absorb water and can
help in transmit the heat from cable.

Is This Answer Correct ?    5 Yes 2 No

IN CABLE TRENCH WHY FILL UP THE SAND. AND WHAT IS THE DIFFERENCE BETWEEN OVER HEAD AND UNDER GROUND..

Answer / k.prakashchandra

Sand remains in the form of loose grains forever,hence
location and removal of cable become easy.Overhead cables
require supporting structures and wires.

Is This Answer Correct ?    1 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron

0 Answers  


Who is the first Bangladeshi Everest climber? Where is his home district?

0 Answers  


i've iocl interview.. if you know the interview process please give me information..

0 Answers  


Is it possible to run HT motor through LT VFD (LT VFD supply given to Transformer LT side and transformer HT side connected to motor)

1 Answers  


What is actual name of Transformer oil.

6 Answers  


How to calculate capacitor bank size at a load 800kVA.

0 Answers  


How to Design green buildings services? What is the advantage to design green building?

0 Answers  


a transformer can beb used as aload?give discription

2 Answers   Esses Eltech Systems,


Can a dc motor works as a dc generator. If yes , then how?

2 Answers  


What is meant by rotor?

0 Answers  


if we want to increase the back up time of an UPS what should we do ? if we want to decrease the charging time of a battery/batteries attached with the UPS what should we do ?

6 Answers  


whati s the sludge current in ups

0 Answers   Future Group,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)