I want Primary side delta and Sec side Star connection transformer . but i have received Star - Star transformer ,shall i use the same transformer by giving the only 3 ph on Primary side without Neutral connection on the Starpoint.
what is the reasons for blowing fuse
why we use battery source for current transformer polarity testing?
present we are having 0.8pf but I want increase it up to 0.99 so what is the formula for it and how can i calculate?
Can u tell me design of switch yard
what is bus pt and what is the function of it ???
why neutral wire thin than phase wire in 4pole conductor
what is mean by PIR in circuitbreaker and give me detail of that?
What are linear elements and non linear elements? and I don't want answers with graph related
why capacitor is not discharged phase to body
We have two Al.busbars each of size 125mm*10 mm connected in parallel.To increase the current rating ,can we connect third busbar of size 100mm*10mm in parallel to existing two busbars?In my opinion ,if we connect busbars of different sizes in parallel,then the busbar of lowest size will take much current.So this type of paralleling should be avoided .Am I correct?
What are the technical reasons for soaking transformers for various times before allowing them to pick load after a fault ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)