Answer / santosh singh
about 9 to 13 kg of binding wire is required per ton of
steel
| Is This Answer Correct ? | 10 Yes | 6 No |
Answer / saalim
1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.
| Is This Answer Correct ? | 6 Yes | 2 No |
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
Whta is the proportion of M30
what type pressure pipe use in sewerage & water supply?
What is M40 _ TOR - EQ and B.F.S
0 Answers Odisha Hydro Power Corporation, Ramky, Simplex,
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is difference between target mean strength and compression strength of concrete?
What is m20 and What is 20 ?
2 Answers Sukhwani Constructions,
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
Types os Water proofing?
rate analysis of shuttering
how to calculate 110kv transmission line tower stub top and bottom diagonals
what is education Cess.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)