Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


binding wire requirement in rcc structures

Answers were Sorted based on User's Feedback



binding wire requirement in rcc structures..

Answer / thangam

10 Kgs Binding Wire per 1MT of Steel.

Is This Answer Correct ?    7 Yes 1 No

binding wire requirement in rcc structures..

Answer / santosh singh

about 9 to 13 kg of binding wire is required per ton of
steel

Is This Answer Correct ?    10 Yes 6 No

binding wire requirement in rcc structures..

Answer / saalim

1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.

Is This Answer Correct ?    6 Yes 2 No

binding wire requirement in rcc structures..

Answer / linu t mathew

1% of steel weight

Is This Answer Correct ?    4 Yes 2 No

binding wire requirement in rcc structures..

Answer / valmik joshi

7 to 8 kgs per 1 MT work of steel

Is This Answer Correct ?    0 Yes 0 No

binding wire requirement in rcc structures..

Answer / manikanta73

for sufficient bond

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?

6 Answers   Dimension Data,


Whta is the proportion of M30

2 Answers  


what type pressure pipe use in sewerage & water supply?

1 Answers   Tulip,


What is M40 _ TOR - EQ and B.F.S

0 Answers   Odisha Hydro Power Corporation, Ramky, Simplex,


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

0 Answers  


What is difference between target mean strength and compression strength of concrete?

1 Answers  


What is m20 and What is  20 ? 

2 Answers   Sukhwani Constructions,


for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how

1 Answers  


Types os Water proofing?

2 Answers  


rate analysis of shuttering

2 Answers  


how to calculate 110kv transmission line tower stub top and bottom diagonals

0 Answers   ACME,


what is education Cess.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)