Answer Posted / santosh singh
about 9 to 13 kg of binding wire is required per ton of
steel
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
how can calculate cutting length of diamond ring
3. What are the disadvantages of your present job, things you do not like about it?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
what is differences between ferrock and concrete ?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is Architect-Prepared Contract?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
how to conversation of all construction material in to brass
What is meant by a context menu in a cad software?
How many pyramid in egypt?
How to design staircase.plz tell me formula for the design the staircase.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure