In reclamation works what are the importance of geotextiles and sand?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
how can we calculate steel value, depending on load
why demand factor less then 1 ?
When was the first motorway built in england?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to calculate canal slope curvature qty!
I need to constructive work in amaraj batteries
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is costing in 100squre feet bricks
Explain what is alternate bid?
What are the different theories of failure under static load?
Explain the different types of roofing systems?
what is the procedure of wet seiving. n percentage of silt in different type of soil?