Pl. give me checklist for installation & commissioning of
machine tool.
No Answer is Posted For this Question
Be the First to Post Answer
meter ratio is 100/5 CT ratio is 125/5, when the ratios changes i.e., CT ratio is 125/5 meter ratio is 100/5 what is the MF in boths conditions?
PLC Training in chennai | PLC Training institute in chennai, PLC Training center in chennai | Best PLC Training in chennai | PLC Training course in chennai | SCADA Training in chennai | PLC Training in india
generator means
Explain how to determine capacitor tolerance codes?
WHAT HAPPEN WHEN A DROP OF WATER MIXED UP WITH TRANSFORMER OIL ?
how can calculated the rating of the 11 KV transformer?
what is the working principle/operation/theory of 3-phase rectifier power transformer used in cold rolling mills.
What is the function of the auto reclosure relay?
what is the maintain in ACB,VCB,MCB,MCCB breakers?
where connected OLTC for transformers?
how many minutes or seconds taken by the transmission of electrical power from generating end to distributing end?
where this neutral connection goes after returning from the load(home ,factory,industries).Is it grounded at the transformer side or atthe generator side .If it is grounded then we also ground the earth connection.is there any problem with this.