what is westage % for steel, concrete,tiles,pains as per
indian staderd code?
Answer Posted / ndd
Wastage depends on type / sizes of the concrete structural
members and how much efforts are giving towards reducing
the wastage of the construction materials at site.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
How to calculate steel for beam slab and column
What is difference between engineering stress and true stress?
What is the substitute of Mastic Asphalt?
Explain major differences between routing maintenance and major maintenance.
How do you compute volume of airflow?
what is mean by c32/40s concrete class
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
silt%= silt volume/ silt+sand volume is this right?
acceptance criteria for concrete works
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
What is the meaning of soil reinforcement?
What out turn civil works
What are the uses of alloys in daily life and how are alloys made?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
how we check the thickness and line of ceiling plaster.