what is westage % for steel, concrete,tiles,pains as per
indian staderd code?

Answer Posted / mohammed aijaz hussain

Wastage % of steel = 2.5% to 5%

Wastage % of concrete = 3%

Wastage % of tiles = 5%

Wastage % of paints = 2%

Is This Answer Correct ?    90 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

1870


In block work seawalls what is the purpose of slip joints?

862


how to conversation of all construction material in to brass

4868


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1881


What is the withdrawal force of steel nails?

768






To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1627


how can we construct building without foundation providing only grade beam at ground level

1177


what is the most suitable foundation when construct a bird watching tower in a marshy land

1502


What is absolute pressure? How absolute pressure is calculated?

766


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1492


how we can find sieve #4 is 4.75mm?

1964


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1874


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2113


What is unit weight of normal concrete?

806


what are the ffactors you considered choosing the course?

1803