Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Whether the over frequency protection is turbine or alternator
and why?



Whether the over frequency protection is turbine or alternator and why?..

Answer / k.prakashchandra

Over frequency relay is for gen and over speed relay is for
turbine.They are normally set at +/- 3 % and 15 % respectively.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is unit of inductance

12 Answers   Bhel, Bosch, OSML, Vijai Electricals, Voltage,


why are the likely reasons for bochholz & pressure relays oprate due to a internal fault but not differential relay ?

2 Answers  


What is the differance between transformer neutral solidly earthed and transformer neutral earthed through resistor?

1 Answers   L&T,


In a transformer ,when voltage decreases current increases. but this is a violation of oms law.why?

15 Answers  


How to choose size of the cable w.r.to current carrying capacity ...

0 Answers   L&T, Saams,


1.25 kg of hydrogen are burnt with stiochiometric air, the mass of air in kg required is

0 Answers   Caterpillar,


In a Dyn11 transformer, how are the 3 windings of the delta connected? Assume that R1-R2, Y1-Y2, B1-B2 are the 3 windings on the HV side.

3 Answers  


if the load is 80 amp for main fuse and 100 amp for breaker so how can we calculate the cable size (cooper ) .

0 Answers   Bhel,


how to calculate the breaking capacity of different breakers.

0 Answers   UltraTech,


why transformers are put with supply for 24 hours before giving supplying to a locality?

2 Answers  


Load transfer in 11kv double busbar switchgear - operation.

0 Answers   KSEB, L&T, Siemens,


I had applied for JE in PSEB, Can you pls send me the Question bank for related to my field

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)