what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35

Answers were Sorted based on User's Feedback



what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35..

Answer / raju msra

14 days

Is This Answer Correct ?    10 Yes 1 No

what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35..

Answer / naresh

14 Days

Is This Answer Correct ?    2 Yes 1 No

what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35..

Answer / sliajit dasgupta

Minimum 7 days, maximum 21 days

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

0 Answers   BARC,


what is silica fumes or micro silica? and whr is it used? wat r its advantages?

10 Answers  


how much used soil in 1 brick of standard size?

0 Answers   Global Career Solutions,


suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?

3 Answers  


what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.

2 Answers  






how many no of cement bags required for 1:4 plastering for 100 sqft? how many no of cement bags required for 1:3 plastering for ceiling for 100 sqft?

6 Answers   Sobha Developers,


how can we calculate steel value, depending on load

0 Answers  


what is mean by "SQP"

1 Answers  


how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?

1 Answers   LiveCon, Sobha Developers,


How much percent of steel use in concrete members etc.slab,beam,lintal,colmn,raft fondation according to concrete volume? Kindly reply me I am in dbout plz

3 Answers  


As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came

1 Answers   L&T,


How much cement ,steel bar, concrete ,required for 416 cum rcc slab

1 Answers   ABC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)