what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35
Answer Posted / naresh
14 Days
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
In the roof of a pumping station explain briefly the components of a waterproofing system?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What is M40 _ TOR - EQ and B.F.S
Stringer How many cm goes to landind
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Which is stronger solid steel rod or hollow steel pipe?
States some of the tool bars used in cad?
how to workable concrete cube test M-25 design mix
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
load combinations how many types for staad design purpose?
what is the use of water bar in water tank and is this an extra item in estimate?
what is civil all interview questions
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
rimmer in pile foundation