what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35
Answer Posted / raju msra
14 days
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What are the advantages of building a dam on the river nile?
Which are the top apps for you civil engineering?
How to do base isolation for RC framed structure using ETABS software?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
how i convert mm into standard wire guage (SWG)no.
What is the difference between tor steel and tmt steel?
What are the alternate material for steel, Sand and aggregate
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
what is the permanent solution applied for restoration of leaning tower of pisa?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?