what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35
Answer Posted / sliajit dasgupta
Minimum 7 days, maximum 21 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Why does the pressure increase under soil?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how to calculate number of bitumen for road asphalt
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
reinforcement slab, beam and column formulas?
what does the grad of cement shows (denotes)?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What you understand by building codes?
IS code for grade of concrete for bamboo lintel????
In the roof of a pumping station explain briefly the components of a waterproofing system?
brickwork labour rate per cum ?
what are RIB slabs explain about it
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE