I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answer Posted / arsh
No. of bars*Total Length*(Dia of bar)^2*(1/162)
The answer will be in kgs.
| Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
how many tonnes equals to one cubic feet?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
What is rolling stock
Define What is a projection line?
How do you measure water flowing through 300mm diameter pipes?
What is a kip?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
plumbing CPVC fitting FTE Brass full form
Describe the various methods of concrete curing?
What are the responsibilities of a site manager?
Design a rectangular channel.
how many shuttering material required for 1000 sq.m built up area.
What are the techniques to measure road difference?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what is floating slab foundation?