I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answer Posted / surajit ghosh
LBD= 24 X 43 X 0.125 (SAY, REQUIRED TO ACHIEVE AS PER
DESIGN)= 129 CUM
VOLUME OF STEEL 1% (SAY, REQUIRED TO ACHIEVE AS PER DESIGN
& BBS)= 1.29 CUM= 1.29X 7850 kG= 10126 kG, Apx= 10 Ton.
| Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What will be weight of 0.5mm GI sheet per sq.ft?
What is the difference between shear and tensile strength?
What is a kip?
How do you maintain water pressure?
Define What is Civil Engineering?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Write short note on construction programme for pile foundation.
How to calculate Volume of Wet cement concrete for a specific grade?
What is the tensile strength of marble?
States some of the commonly used commands in cad software’s?
In reclamation works what are the importance of geotextiles and sand?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.