how to calculate required shuttering material like
props,spans,plates ..etc for a slab?
Answer / sahilshah.civil@gmail.com
Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end
| Is This Answer Correct ? | 6 Yes | 1 No |
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
a wall having area 100 sqft and bricks size 19cm*9cm*9cm so how many bricks required...
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
difference between specification and method of statement
What kind of tests will conduct in plastering
if any chance to getting a set of solved major building estimate with the drawing.(soft copy)
In earth work 1300 cum soil how to calculate how many liters require in water
what is the density of steel and concrete in kg/m3?
what is project planning
in pile foundation pile socketing length depend on which factores?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)