Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate required shuttering material like
props,spans,plates ..etc for a slab?



how to calculate required shuttering material like props,spans,plates ..etc for a slab?..

Answer / sahilshah.civil@gmail.com

Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end

Is This Answer Correct ?    6 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

0 Answers  


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

0 Answers  


a wall having area 100 sqft and bricks size 19cm*9cm*9cm so how many bricks required...

14 Answers   Jain Group,


Can anyone tell me the salary and job profile of transportation engineers/transport engineer?

1 Answers  


difference between specification and method of statement

3 Answers   L&T,


What kind of tests will conduct in plastering

6 Answers  


if any chance to getting a set of solved major building estimate with the drawing.(soft copy)

0 Answers  


In earth work 1300 cum soil how to calculate how many liters require in water

0 Answers   L&T,


what is the density of steel and concrete in kg/m3?

7 Answers   Nespak,


what is project planning

2 Answers   NCC,


in pile foundation pile socketing length depend on which factores?

2 Answers  


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)