how to calculate required shuttering material like
props,spans,plates ..etc for a slab?
Answer / sahilshah.civil@gmail.com
Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end
| Is This Answer Correct ? | 6 Yes | 1 No |
How do You Maintain a structure after getting cube test of low strength.
how much cement is required for 100 sft plastering of ratio 1:4
6 Answers Confident Group, L&T, M N Creations,
what does a civil engineer should know?
Brick is fire resistant than stone because––
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
In pile foundation which kind of action are take place?
1)What is swear, swage and storm water? 2)What are the sizes of bricks based on Nominal, practical and standard? 3) What is the distinguies between the grade of cement 43, 53?
What is a Quick Sand?
where vr providing singly reinforced beam. i want to know the location of it in a building
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
what is the significance of soundness test in Cement? and how is it done??
1 Answers Biltech Building Elements, Student,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)