what do you mean by gap document
Answers were Sorted based on User's Feedback
Answer / darank
Gap Document describes how to bridge between As Is and To Be
scenario and ways to achieve this by means of user exits.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / raje
GAP Document describes AS-IS scenarios not handled
currently or for which no current TO-BE exists. These
scenarios or functionalities need to be addressed by some
functionality, custom development or through workaround in
the new system.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / viswanath
once complete the as-is process then we will conclude if any new one arise we enter in to-be process.
the new concept what we analyse that comes under GAP ANALYSIS
Is This Answer Correct ? | 0 Yes | 0 No |
What is Plan Depreciation(AFAB)
What are the different line item reports? : cost center accounting
issue :- GL 400009 required an Assignment to Co object. :- Hi Expert Consultant Could you help me please. I checked in Controlling Area CO object. But while GL posting park document, using by T-code FBV0. Rent A/c..Debit and Bank A/c ...Credit. the system is giving Error : GL 400009 required an Assignment to Co object
In gl master, we have a option “balance in local currency” and “account currency”. What does it mean?
how can we get life project knowledge
How many documents generated at the time good received?
What are the disadvantages of Business Area.
What do you mean by year dependent in fiscal year variants?
What is meant by a “baseline date” in sap ar and ap?
Go Live and Cutover plan?
DIFF BET NORMAL & NEGATIVE POSTING?
what is park document?difference beween park document and hold document?