for concrete cubes samples.. what if the 7 days gain the
strength of 42.34 mm/2 and the 28 days only gain the strength
of 37.5 mm/2?
Answers were Sorted based on User's Feedback
Answer / vikranth geddam
sampling and curing for 7 days might be correct. And for 28 days sampking might not be done correctly and at the same time curing also.
Is This Answer Correct ? | 1 Yes | 0 No |
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is Refuse Area ? And What is Definition ?
minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction
what is directivity effect?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
details of steeel
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
How much sand for a 1000 sqft residential building ?
What Are The Steps Involved In The Concreting Process, Explain?
what is a steel formula
what is the Asfalt test?in road constraction..?