how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answer Posted / vasanth

Skilled labour 1.5 m3, Un skilled .7m3

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1472


Advantage of Aluminum form work in terms of activities can be skip and cost too

576


Consumption of Binding wire for fixing of cover block in vertical surface

1053


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2107


.5Ast

1357






may i know the detailed description of cutting length

1645


How do you convert wind speed into force?

745


i want texture painting pwd data

1657


What is Heavy Concrete & Normal Concrete

2244


what is work of planning deptt. in any construction compny (in road project)

1897


What are the steps involved in the concreting process?

884


How many feet are in 4 square yards?

739


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2165


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1207


what is the productivity in aluminium shuttering per day

1589