how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / vasanth
Skilled labour 1.5 m3, Un skilled .7m3
Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Advantage of Aluminum form work in terms of activities can be skip and cost too
Consumption of Binding wire for fixing of cover block in vertical surface
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
.5Ast
may i know the detailed description of cutting length
How do you convert wind speed into force?
i want texture painting pwd data
What is Heavy Concrete & Normal Concrete
what is work of planning deptt. in any construction compny (in road project)
What are the steps involved in the concreting process?
How many feet are in 4 square yards?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
what is the productivity in aluminium shuttering per day