how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / akbar khan
if you tell about both in this context,it will be highly
appreciated.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
types of survey and levelling instrument ?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
What is chemical composion test
how to calculate load bearing column
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is the effect of duration of earth quake on framed structures ?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is command line?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Explain what is structural frames or systems?
What is min thickness,min grade of conc & age of PQC ?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.