how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / akbar khan
if you tell about both in this context,it will be highly
appreciated.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Why steel rods are produced only in even dimensions?
What is the density of DLC & PQC and how it is differ from normal concrete?
What things you need to take care of before building a kitchen island?
How to marking the building
How do you compute volume of airflow?
What is pre-stressed concrete?
What is horizon or horizontal mining?
What is the standard volume of pharma in cub ft
What expenses counted in contingencies and how much it is in related to built-up area of the building.
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
what is civil enginnering & what you need of this course?
Write short note on construction programme for pile foundation.
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
is basic cost of the material includes tax?