how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answer Posted / akbar khan

if you tell about both in this context,it will be highly
appreciated.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

types of survey and levelling instrument ?

1283


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1738


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

1700


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

1785


What is chemical composion test

1511






how to calculate load bearing column

3063


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1702


what is the effect of duration of earth quake on framed structures ?

1808


where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.

2900


Advantage of Aluminum form work in terms of activities can be skip and cost too

569


What is command line?

695


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1545


Explain what is structural frames or systems?

659


What is min thickness,min grade of conc & age of PQC ?

8508


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.