DEAR ALL,
PLEASE ANYBODY CAN GIVE ME THE DEFINITION OF CORE RISK
MANAGEMENT OF BANKING.
REGARDS,
RASHID
No Answer is Posted For this Question
Be the First to Post Answer
How many stairs did you climb before getting into my chamber....???? (subject to the location of the chamber)
the u.s.a. is global bully. india is a regional bully.
the question asked in financial management , what will your out look towards maintenance of liquid assets to ensure that the firm has adequate cash in hand to meet its obligations at all times? i need this answer in 5 to 6 pages in brief
Write a program to search an integer from and array of 50 elements. Print message that the integer Found or Not Found.
sbi clerical exam question bank
19 Answers ABC, Bank Of India, CTS, LCC, Nihon Technology, Standard Bank, State Bank Of India SBI,
Leaders are not born but made-Explain. Leadership is situational-Explain
What is equity share suspense?
what is bpo ?
Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.
i have been selected for sbi clerical interview, please give me the details, what r the questions i can expect in the interview,send your sugesstions to rathi4chemi@yahoo.com
4. State & explain the various financial & non- financial incentives to motivate the people in an organisation.
Research serves a single purpose that of providing information to assist marketing manager to make better decisions? Elaborate this statement.