Answer / venkatesh
1 is cement
5 is sand(fine)
10 is aggregate(corse)
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / md gyasuddin ahsan
In P.C.C
1 is cement
5 is corse sand
10 is aggregate
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / shivam sharma
1 is cement
5 is sand(fine)
10 is aggregate(corse)
| Is This Answer Correct ? | 1 Yes | 0 No |
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
In T beam design, which are the regions selected as rectangular and Flanged ?
What are the responsibilities of a construction manager?
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
In which code or text book can i get the reinforcement detailing for slabs, beams, columns.
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what is PEB structure
How much lap length provided in compression and tension in bridges?
Deduction in length of reinforcement steel for bar bending
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
In case of tunnels (Railway) what is the way of securing a wall beam?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)