Answer / adil abbasi
In structural engineering, a pre-engineered building (PEB) is designed by a PEB supplier or PEB manufacturer, to be fabricated using best suited inventory of raw materials available from all sources and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements.
| Is This Answer Correct ? | 4 Yes | 1 No |
A PEB (Pre-Engineered Building) is a modern construction system where components like columns, rafters, purlins, and cladding are factory-fabricated and assembled on-site. These structures use welded I-sections, cold-formed members, and steel sheets or insulated panels for roofing and walls. PEBs are popular for warehouses, factories, showrooms, and large halls due to faster construction, cost efficiency, lighter weight, and easy expansion. They offer quality control, durability, and low maintenance but need protection against corrosion, heat, and fire. Common types include clear-span, multi-span, single-slope, lean-to, and hybrid designs, making them versatile and sustainable for industrial and commercial applications.
| Is This Answer Correct ? | 0 Yes | 0 No |
Explain what is Critical Path Method (C.P.M)?
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
function of stirrup in rcc beam & column?
2 Answers KMDA-Kolkata Metropolitan Development Authority, TK Group,
what are the tests to be done for grout material, and procedure for compressive strength test procedure for grout material?
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
by which IS Code bend correction is two times of the dia meter of steel is taken
what are RIB slabs explain about it
How to find the no. of main bar in circular footing (Central shaft of CLF)
3 Answers N J Devani Builders, Simplex,
how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculation
34 Answers Call Centre, CCCL, Oracle, RLM, RPP, Sunanda Infra, Sunrise Enterprises,
Please i want to know how to find column main bar cat of length
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)