Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


wt kind of business we can do by usig PLC?

Answers were Sorted based on User's Feedback



wt kind of business we can do by usig PLC?..

Answer / kesava reddy .g

Normmally PLC is Programmable logic controller used to
automate the process / machines to reduce manual
interactions and to increase the productivity and quality.

Is This Answer Correct ?    12 Yes 0 No

wt kind of business we can do by usig PLC?..

Answer / achyuth

PLC is a Programmable logic device which is connected to the field instruments for controlling and monitoring using certain languages like LADDER LOGIC, FUNCTIONAL BLOCK, STRUCTURED TEXT, INSTRUCTION LIST, SEQUENTIAL FLOW CHARTS.

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Instrumentation Interview Questions

Why 4mA-20mA current loop selected as standard ???

1 Answers   IMCO, Reliance,


What are the questions asked in fresher instrumentation candidates

0 Answers   Polmon,


key exchanges in wpa,wpa2,tls

0 Answers  


When a timer is placed in RS Logix 5000 with preset value less than its scan time it is malfunctioning. i.e., if the preset is set to 30ms still the timer TT bit is counting till 150ms(its scan time). Any solution for the problem?

2 Answers   Balco,


In E&I diagram what is the meaning of rectangular box and circular box

3 Answers   L&T,


what is the working principle of ABB gas analyser of kiln in cement industries

4 Answers  


what is meant by calibration

3 Answers  


in split range control system we are using two control valves,but we have only one positioner and one feed back link.so how we use this one feed back link for two control valves?

2 Answers  


steam drum level transmitter calibration procedure? with example?

1 Answers  


How can a d.p. Transmitter be calibrated?

0 Answers  


Good Evening all.My question is - For a feed water line to an equipment if i need to measure the flow we will use orifice /magnetic/vortex depend on cost/spec.If i need to measure a ''Alarm''signal and ''Interlock'' from one point i think we can use orifice type in one location with 2 different tapping points - one for alarm and one for an interlock to flow valve..If in case i need to have both these signals(Alarm & interlock) from magnetic flow meter,is it possible??will 2 seperate sensors will be located inbuilt r we can program it ??..i thk we can have one transmitter with these 2 signals...need to know any technical issues are there?pls clarify

3 Answers  


what is Instrument Schedule, and what it is mainly used for?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)